Gel Coat
Gel Coat ISO NPG (High neopentyl glycol content)

Our manufacturing system combines industrialized processes, technical control at every stage, and optimized installation to reduce on-site construction time.
En Mon de Pra hemos desarrollado un sistema patentado que garantiza máxima resistencia, durabilidad y calidad en cada piscina. Un proceso preciso y cuidado al detalle para ofrecerte una estructura sólida y fiable para toda la vida.
Eight layers combined to create a resistant, watertight, and durable pool, with the highest quality in every detail.
Gel Coat ISO NPG (High neopentyl glycol content)
Mat 300 laminate with high chemical resistance resins
Interlaced MAT laminate sandwich with isophthalic resins
Interlaced MAT laminate sandwich with isophthalic resins
Interlaced MAT laminate sandwich with isophthalic resins
Steel skeleton in the vital parts of the pool shell
Spray coating of reinforcements and skeleton made from recycled materials.
Total resin impregnation with eco-friendly paraffin agents for environmental conservation.
Our manufacturing standards focus on reliability: raw material control, traceability, and final verification before delivery.

The structure integrates reinforcement and isophthalic layers for greater durability against intensive use.
The constructive solution reduces temperature loss and improves bathing comfort.
Each unit undergoes internal validations for finish, thickness, and watertightness.
The entire lamination and reinforcement process of the shell is carried out manually to achieve the maximum mechanical resistance of the pool.
We work with a continuous process that connects design, manufacturing, and assembly to deliver a ready-to-use pool in just a few days.

First, the location of the pool is decided. Factors such as stair access, sunlight, and slope must be considered. Once the location is defined, the excavation of the ground is carried out.

Next, the ground is leveled with small gravel to ensure the pool is correctly supported at the bottom.

Once at your home, the pool is unloaded and inserted into the hole excavated and leveled by the operators, provided that distances and terrain allow it.

Once the pool is installed, the levels are checked again. If they are not correct, they are adjusted until the pool is perfectly level.

We fill all the remaining space between the pool and the excavation with gravel. This way, we prevent any possible movement.

At this point, all that remains is to install the pipes, skimmers, filtration system... This can be done in parallel with the gravel filling. Everything is installed and connected to the filtration shed or technical room.

To ensure the correct installation of your pool, we create a concrete ring beam to settle it. We always recommend placing mesh reinforcement in the concrete.

Finally, custom-made coping stones are usually placed for each polyester pool model. However, some families prefer the installation of wooden decking or a full terrace.
We help you choose format, dimensions, and finishes based on your intended use and outdoor space.
Our swimming pools come with a 20-year structural warranty, and up to 40 years for our Ceramic de Luxe models. So that when you think about owning a pool, you have no doubts about the quality we offer. We have been manufacturing models for 30 years designed to simplify maintenance and avoid unexpected costs. Our 8-layer system provides a more resistant, stable structure with low long-term maintenance. Your only concern will be enjoying your pool.