Fiberglass Pool Installation Timeline
Mon de Pra
Mon de Pra
Back to list

May 10, 2025

Fiberglass Pool Installation Timeline

A Mon de Pra pool can be installed in 7 steps. Yes, just 7 steps! If the ground conditions are suitable, your pool can be installed and ready for use in just four days.

What are the steps for installing a prefabricated pool?

Excavating the ground

The first step is to decide where to place the pool. Once this is done, the groundwater level must be checked before excavation begins!

Preparing the ground

It’s now time to level the hole by adding small gravel, and then level the gravel so that the pool rests properly on the bottom.

Pool placement and levelling

The pool is then unloaded and placed into the hole excavated and levelled off by the workers, leaving it perfectly level.

Back-filling the perimeter

The excess space between the pool and the sides of the excavated hole is back-filled with gravel to prevent any movement. Mon de Pra pools have large reinforcements installed around them to strengthen the structure without negating the positive flexibility of the material; for example, if there are earth movements, this flexibility helps prevent leakage or breaks in the pool structure.

Peripheral installations

All that remains now is to place the pool systems in parallel with the gravel backfill. Everything is left installed and connected, including the pump house.

Concrete edge

To ensure the proper installation of your pool we always recommend putting wire mesh in the concrete.

Placing the coping stones

Finally, we place the coping stones, which are custom-made for each polyester pool.If the ground is suitable, with these 7 steps you’ll have your new pool within 3-4 days.